2011 North Whitemud River Drilling Program
A 148 hole drilling program on the company’s North Whitemud River block was completed in late March, 2011. A 75-person drilling camp was established at the Ironstone airstrip at the north end of the Notikewin Road. Five drilling rigs were used to complete the drilling and diamond coring.
A total of 12,086 metres were drilled, and over 4,500 samples were analyzed. The results are reported in SRK’s revised NI 43-101 report in November 2011.

Map of North Whitemud River 144 drilling locations

Ironstone’s Core Handling Facility erected at camp site